Wednesday, August 13, 2025

Singapore - To Do 13Aug25 (Green Corridor Cycle Hillview - Buno Vista)

Singapore - To Stay
Singapore - To Eat
Singapore - To Do

Green Corridor Cycle
13Aug25



We finally got the opportunity to try out this routing along part of the Green Corridor. 
You maybe interested to check out these other cycling routes with a variety of views and varying difficulty for young families. The Green Corridor traces Singapore’s former KTM railway line, now a lush 24 km trail teeming with wildlife.

We had parked at Dairy Farm Rd Car Park A and rented from Ride Sharing bicycle found around the MRT station. There are many entry points to the Green Corridor along the way.
ABBATip:
- Probably start after Rail mall/ King Albert Park MRT Station for a smooth SOUTHERLY ride from Rail Corridor park. (Click here for full review) along the Green Corridor. 
We entered via Hillview MRT and exited via Buona Vista. The road conditions were pretty uneven with bumps and humps and smoothed out closer to  the Rail Corridor. 

*Rougher road conditions up until nearing Rail Corridor park.*
*Rough ride for the first third.*
*Smooth riding as it reaches the Rail Corridor park and beyond. That's pretty much the scenery all the way with some variations.*
Pros:
- Nice long stretches of unblocked cycling. 
- Surrounded entirely by nature. 
- Riding along a piece of Singapore's history and able to checkout the Former Bukit Timah Station.
- Easy access with multiple entry and exit points along the green corridor.

Cons:
- Too narrow. With hikers on one side and pretty much single lane traffic its a tight squeeze.
- From where we started and ended, probably the first third was bumpy and quite unpleasant to ride. So much so we took public back to our start point.
- Not much variation to the scenery. In fact we made a slight detour along Holland Green Linear Park for some nice paved cycling track and variations in the view. 
*Nice stretch with beautiful wide longkang along Holland Green Linear Park.*

No comments:

Post a Comment